【廣告】
合理的模具設(shè)計。在級進模中,下料順序的安排有可能影響到?jīng)_壓件成形的精度。針對沖壓件細小部位的下料,一般先安排較大面積之沖切下料,再安排較小面積的沖切下料,以減輕沖裁力對沖壓件成形的影響。
Reasonable mold design. In progressive die, the order of blanking sequence may affect the accuracy of stamping forming. In order to reduce the impact of punching parts, the punching and cutting blanking of small area is arranged in the light of the blanking of the small parts of the stamping parts.
五金沖壓件材料的硬度檢測,其主要目的就是確定購入的金屬板材退火程度是否適于隨后將要進行的沖壓件加工,不同種類的沖壓件加工工藝,需要不同硬度級別的板材。
stamping material hardness testing, the main is to determine whether the purchase of metal sheet annealing is suitable for subsequent stamping parts processing, different types of stamping processing technology, the need for different hardness levels of the plate.
日常模具生產(chǎn)中,應(yīng)注意維護沖切凸、凹模刃口的鋒利度。當(dāng)沖切刃口磨損時,材料所受拉應(yīng)力將增大,從而沖壓件產(chǎn)生翻料、扭曲的趨向加大。
In daily mold production, attention should be paid to sharpness of punching and concave die edges. When the cutting edge is worn, the tensile stress of the material will increase, and the stamping and bending will increase.