【廣告】
PPR管熱熔連接方法
安裝準(zhǔn)備——預(yù)制加工——干管安裝——立管安裝——支管安裝——管道試驗(yàn)——管道沖洗——管腔內(nèi)消毒
Hot melt joining method of PPR tubeInstallation preparation - prefabrication - main pipe installation - riser installation - branch pipe installation - pipe test - pipe flushing - disinfection in the pipe cavity
鋪設(shè)好的冷熱水管一定要用卡扣固定好,避免后期裝修過程中水管移位,導(dǎo)致接頭脫落、松動,產(chǎn)生漏水隱患。盡量做到每隔60cm就要安裝一個卡子,切記卡子安裝一定要牢固。成品保護(hù)很重要,PVC排水管制造,鋪設(shè)的水管,避免有重物壓在水管上。
Water pipe le
The laid cold and hot water pipe must be fixed with clamps to avoid the displacement of the water pipe in the later decoration process,PVC排水管生產(chǎn), which leads to the joint falling off and loosening, and the potential water leakage will occur. Try to install a clip every 60cm, and remember that the clip must be firmly installed. The finished product protection is very important. The water pipe laid should be protected from heavy loads on the water pipe.
管道壁厚的增加直接帶來的性能的提升,比如:工作壓力增大,墊江PVC排水管,剛性增強(qiáng),線性膨脹系數(shù)降低,PVC排水管加工,耐溫性能提高等等。
The increase of pipe wall thickness directly improves the performance, such as the increase of working pressure, the increase of rigidity, the decrease of linear expansion coefficient, the improvement of temperature resistance and so on.
企業(yè): 臺州艾菲力塑膠有限公司
手機(jī): 13857609010
電話: 400-1182827
地址: 浙江省臺州市三門縣西區(qū)開發(fā)區(qū)