【廣告】
ppr水管在連接時,無旋轉(zhuǎn)地把管端導(dǎo)入加熱套管內(nèi),插入到所標(biāo)志的深度,同時無旋轉(zhuǎn)地把管件推到加熱管上,達到規(guī)定標(biāo)志處。一般地可用心中默讀數(shù)字法掌握加熱時間,或觀察管件、管材的加熱程度,當(dāng)模頭上出現(xiàn)一圈PPR熱熔凸緣時,即可將管材、管件從模頭上取下進行下道工序。
When the PPR water pipe is connected,PVC排水管廠家, the pipe end is led into the heating sleeve without rotation and inserted to the marked depth. At the same time, the pipe fitting is pushed onto the heating pipe without rotation to reach the specified mark. Generally, the heating time can be mastered by reading numbers in heart, or the heating degree of pipe fittings and pipes can be observed. When a circle of PPR hot-melt flange appears on the die head,PVC排水管咨詢, the pipe and pipe fittings can be removed from the die head for the next process.
In recent years, with the continuous development of economy and social progress, the industry, municipal engineering, irrigation works, agriculture and other industries are also developing. In these industries,PVC排水管加盟, PPR pipe and PVC pipe are two commonly used pipes, both of which have their advantages.
Uk Gafloon Pipe Group Ltd水電安裝預(yù)埋管線注意事項給排水部分
·衛(wèi)生間排水管的預(yù)留洞位置必須準(zhǔn)確,避免二次修洞破壞結(jié)構(gòu)。
·有些衛(wèi)生間或廚房的排水管與相鄰陽臺的排水相連,鄂州PVC排水管,為了美觀及不破壞結(jié)構(gòu),梁內(nèi)可預(yù)埋剛制套管,避免以后打洞鑿斷鋼筋。
Water supply and drainage part of embedded pipeline in hydropower installation of Uk Gafloon Pipe Group Ltd
· the place is the reserved hole of the toilet drainage pipe must be accurate to avoid the damage of the structure caused by the second hole repair.
· the drainage pipes of some toilets or kitchens are connected with the drainage pipes of adjacent balconies. In order to be beautiful and not to damage the structure, rigid casings can be embedded in the beams to avoid drilling holes and cutting steel bars later.
企業(yè): 臺州艾菲力塑膠有限公司
手機: 13857609010
電話: 400-1182827
地址: 浙江省臺州市三門縣西區(qū)開發(fā)區(qū)